Which fault is caused by lightening and thuderstorm
a. Line to line fault
b. Single line to ground fault
c. Double line to ground fault
Answer Posted / praju
b
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
TYPE'S OF BREKAR ,WHAT IS TRANSFORMAR & SAFTY. STARTER DOL & STAR DELTA STARTER.
What is milivolt dop test in Busducts? What is its significance & procedure to do the test?
Why back emf used for a dc motor? Highlight its significance.
What are the advantages and disadvantages of open loop control system?
1600kva capacity Transformers how the bucholz relay,Oil temperature,winding,surge relay relays setting are to be done
What is an ideal transformer?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
is the value of inductance depends upon the evalue of thitha in doubly excited machine?
What is cable tray, its type, and its support?
How to calibrate or test an LT Air Circuit breaker 440 volts, 35 KA, 800 Amps ?
sir i had plane to do some project with the base of hopkinson test in AC supply its possible
Explain Energy and Power signals?
Why PS class CT is always preferred for Differential protection?
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.
TCS IS IT COMPANY THEN WHY DO THEY NEED ELECTRICAL &ELECTRONICS ENGINEERS?