What is the meaning of M50,20? What is 50,what is 20
Answer Posted / mallikarjun rao
In this Question M stands for Mix design and 50 or 30 stands for strength i.e 50N / Sq.mm and 30N / Sq.mm.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
what are RIB slabs explain about it
Define What are the materials used in building a gravity dam?
why we can use dust in concrete insted of fly ash
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
in 100 cft = 1350 bricks in 100 cft = ? bloks
how to check and keep control on the wastage of material at site
What quantity of 1.0 m3 bricks required?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches