Answer Posted / panneer
0.002
| Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
how much cement sand n bricks required in im3?and how much in plaster?
What is fineness modulus ? and its sieve # ?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
Will water damage concrete?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
Different sizes of Hollow blocks and its weight. Thanks.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
can you give me the details of rate analysis of steel and concrete?
What is Base Shear ?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
How to find the cuplock pipe qty in staging for Minor bridge?
How to decide/consider the grade of bitumen for dbm.
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?