How to find the no. of main bar in circular footing (Central shaft of CLF)
Answer Posted / jhunu mandal
Dia. of footing= D
Side Cover - C
Specing = S
Nos of bars = D-2(C)/S
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to calculate quantity of plum masonry in 1:3:7
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
all technical question
what is the meaning of 40/20 src
what is that one cub metre plaster in cemant and fine sand
How many cum of 9.5mm stone in 1 ton ?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
what is diffrence between catchment area,watershed and basin?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
What are the materials used in building a gravity dam?
how do we design mix ratio?
how to calculate spacing rod in column