Answer Posted / poras patel
top level of foundation / Bottom level of foundation = Depth of foundation
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is componsation
what does the track parameter mean in staad.pro?
Test procedure of fly ash bricks as per code ?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
what is the tensile strength of 10swg and 8swg gabion wire?
what is mean by c32/40s concrete class
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
pls give me ans to ACT formula cube testing porpuse
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
WHAT DLC DESIGN IN CONSTRUCTION
plz.show development and anchorage length in simple diagram.
Which is the direction of negative angle?
What are the advantages of cad software?
significance of specific surface area of particles?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?