Which is the IS code Using for Cement Sand Mortar
Answer Posted / shannukg
Is 10262.2009 this is the perfect
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
how to calculate the density for high density concrete ? or is it same as the density of RC?
how much repeitation for conventional and maivan formwork?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is the difference between Hinged and pinned in Column ends
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Define What is rigging?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
What are the common ways of demolition?