what is the difference between mortar and concrete???

Answer Posted / karishma rizal

Mortar is used to hold building materials such as brick or stone together. It is composed of a thick mixture of water, sand, and cement. The water is used to hydrate the cement and hold the mix together. The water to cement ratio is higher in mortar than in concrete in order to form its bonding element. When mixed, it is a much thicker substance than concrete, making it ideal as a glue for building materials like brick. Because mortar must be replaced every 25-50 years, it isn’t practical for structural projects.

Like mortar, concrete is a mixture of sand, cement, and water, but it also contains rock chippings or gravel which makes it much stronger and more durable than mortar. Because it needs a low water to cement ratio, it is much thinner when mixed, making it difficult to use as a bonding element. Concrete is used in structural projects and is often reinforced with steel rebar to maintain its structural integrity as the soil beneath it settles. It is best used for support, such as beams, walls, or other building foundations.

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the primary difference between adsorption and absorption?

737


How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?

1547


Why Vitrified tile are getting pop up.

541


1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40

2275


In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:

2963






3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.

1639


How to calculate construction cost of residential building in mumbai

1485


procedure for preliminary selection of size of column of 5 storey building

2563


Define relative co-ordinates?

701


What is labor and material payment bond?

645


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

1875


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

846


How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.

2169


what is the maximum number of course that can be laid according to IS code and the max height.

1494


Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

2108