if suppose boiler has high heavy tube leakage, so in which time we feed the water in a boiler. can we stop the feed water at particular combustion temperature.
Answer Posted / mayur mukaty
In normal operation if boiler feed pump stop within a 1 min level goes down to become zero. For best practices when tube leakage heavily fuel feeding stop, take down the load, maintain draft , and take manually FRS system to maintain drum level as for as possible. For latest technology improvement ultra sonic senser are deployed for detection of location of tube failure.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
what does mean by kva rating
Why superheated are started before I'd and rd fan?
what's the moog valve
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what is restricted earth fault explain in details
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
what is natural frequency of turbine shaft .
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
what is the meaning of SST300 V56A in SIEMENS turbine
By any way can we increase the B check hours from 300 to 500
What is LB-SR.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
operation
LAPT working in alternator / generator