how to calculate the quantity of steel used for construction..
Answer Posted / rajeshkerai
Normally the steel used for the construction is calculated from the bending schedule provided with the structural drawings. if not, than it will have to be measured from the drawings. for each and every members.
Eg: If a beam of 6m long and uses 6nos 16mm reinforcement then it will be
6x6= 36m x 1.58(weight of a 16mm bar/ 1m length)= 56.80kg
if the beam is continuous than we will have to add up laps (normaly 50 x the diameter of steel).
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
What is c.g.i sheet which used for roof??
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
what discoveries did you have in relation to your course?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
all technical question
how pumping of concrete effects the quantity of material used in it?
How is calculate the cube molt
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
why we create short columns under grade slab?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
how to calculate quantity of bricks in circular manhole with examples.
How many axes do cartesian coordinate system has?
how i convert mm into standard wire guage (SWG)no.
Will going from a 3-tap to 6-tap increase water pressure?