Answer Posted / nvr
in 3/2 SOV. 3 stands for total 3 nos of port.2 stands for supply input and output.remaining 1 no port for drain/vent.
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
Why do you want to work here
give some question relative instrument fitter?
Please send me the sample question of Instrumentation of hpcl/iocl exam. my mail id hihi_kiholo@rediffmail.com
What are the interlocks we have to check during the start up of LP/HP compressor?
What is the use of each wire in three wire RTD
IS there any effect of vortex in low pressure side of the transmiter after the orific in feed water line? if yes then what is the calculation?
What is the meaning of wet leg
why we are using magnet for calibration of gas detector?
can you send remote seal interface level transmitter calculation steps for oil water saperator.
why use 50% lel methane gas concentration for gas detector calibration instead of 60% lel gas concentration whereas the hi alarm set at 60% lel.
Why is it necessary to use compensation leg to measure the liquid level in a closed or pressurized tank?
how many pulses are required by a ac induction servo motor of 4 poles with 50 Hz frequency to rotate by 1 degree?
Drum level tx with GP4 with zero elevation:7300mmh20 on HP and 8050mmh2o on LP as range but on commissioning the tx readiing is max,Why this reading?
why we use cascade control and feed forward control in 3 element drum level control measurement of steam drum .what is cascade and feed forward control system ?give example .
What is the use of single seated valve?