Answer Posted / amit dutta
concrete are two type like 1.green concrete 2.hard concrete./
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
in design case of structural member best suitrable percentage of steel limit is what
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Define current ucs?
what is Brest Wall?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
What is the name of this multiplication factors ?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate