15mm thick plastering 1:4 what is the cement consumption per sqm
Answer Posted / sunil
6.52 Kg
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Explain the mechanism of cavitations in pipes and drains?
Formula for calculating the volume of bulb in underreamed pile
whats is difference between anchorage length and development length
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
how statics is different from dynamics
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
What is a tensile strength? What is the tensile strength of wood?
how i can tak Quantity of mortar in block work
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
Explain creep?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
For Wet Mix Mecadam design what is Optimum moisture content
please send me bhel questions on rupesh.017@rediffmail.com