Answer Posted / pk
Cut lenght for ring.
A= l-2*cover
B= l-2*cover
cut length=2(A+B)+24d
for beam main baar
L=l-2*cover+9d+height of beam
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how water proof chemicals act in concrete to avoid leek?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
Define What is diversion tunnel in a dam?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
What is OSHA compliance?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
please briefly explain calculating or estimating steel quantity for a RCC column?
Is it possible to make a feature using an overdefined sketch?
Write short note on construction programme for pile foundation.
Can we apply curing compound on ceiling (slab Bottom)
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is thumb rule in quantity and cost estimation of a residential building?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
How to arrive dry volume of concrete (1.52 to 1.57) ?