In my home i am getting too much electricity bill (more than 4000) but I am very much sure that we are not consuming that much. How i can check this ?
Answer Posted / akaram
Your old meter pic upload on olx. And sell it then purchase new meter from flipkart. Try this
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
What are books to be referred for KPTCL exam?
1)we have 1000 cfm Blower,Dia-1Mtr,Velocity of air 94 m/s 2)We have Natural Air velocity 94m/s 3If i Put Wind Mill in natural air ,speed is 94m/s Then it will generate Assume 100kw 4)If i put same wind mill across the Blower,air speed is same 94m/s now the Question is Will it generate 100 kw?
pls tell what are doing the three phase motor star and delta connetion with circuit diagram and control wiring .
WHAT IS MEANT BY TV TERMINAL IN 500MVA TRANSFORMER?
WE HAVE THE DC RECTIFIER 1500A, INPUT VOLTAGE IS 3 PHASE. HOW TO CALICULATE THE LOAD? 3 PHASE SIDE EITHER dC SIDE. PLEASE SUGGEST ME
Which motor is 3.3 or 11kV more reliable, in terms of efficeancy,maintenance, reliability.
what is effect of 5amp fuse on 2mva pry protection of transformer
Explain the term parallel path in dc machin ?
what is the difference between "Rotary bypass isolation switch and Normal bypass switch" pls share indepth techs?
aternator every parts and its working
sir pls send the je exam - 2008 and other model question papers..
The metal-enclosed switchgear and controlgear is subdivided into three types: 1. metal-clad switchgear and controlgear; 2. compartmented switchgear and controlgear 3. cubicle switchgear and controlgear. What is the main differnence between them. State some example.
explain me the relation between torque, frequency,speed,voltage and current in the 3 phase induction motor?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
Classify driling machines.