Answer Posted / ruchi tiwari
material should be finished material andshould be created with sales view. on sales plant data view, we have to give loading group and general group.availlibiulity check should be ticked.go to menu path-
spro-img-logistic execution-shipping-basic shipping function-shiiping point and goods receiving point determination- assign shipping point
and check for relevent assignment.If these things are available then sure shipping tab will appear on STO PO.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is mysap erp?
Explain the basic 'organizational structure' in mm?
Explain the 'accounting' side of gr?
What is the class type?
What is a batch?
What is a cost center?
What are the different sections in vendor master data?
Difference between planned delivery time and gr processing time?
What are the levels at which a batch number can be configured?
How can we create an information record based on the material master?
What is the ‘price control indicator’?
What is an abc indicator?
How to create pr or po by mrp?
Suppose you purchase new air filters and return the old damaged filters. This is a case of purchase and return simultaneously. How will you map such business scenario in sap mm?
Can we change the layout of miro screen? Does it require enhancement?