Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

in three phase it represented by R-Y-B.what is full form of
R-Y-B.

Answer Posted / sunthannagesh@gmail.com

R=red
Y=yello
B=blue
thise is as per international beuro of electricfication IBE this is a standerd code

Is This Answer Correct ?    13 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is different type of Electrical curve and how it protects the equipment's while up-normal situation?

1874


who can measure the size of power cable?

2206


what about the power of wattmeter at starting and loding?

2147


what are the parameters plays a major role in Potential transformer Burden calculation??

2281


we use 400/5A ct and 35/roor3KV,/0.1/root3KV,0.1/root3KV pt ratio. What is the multiple factor of this meter.

2062


Why Utility Distribution System in India is mainly at 11 kV? Why not Utility go for 33 kV?

1787


How does the slip regulator works as a startor

2019


show the single line diagram of star delta starter with single phase preventer

4697


where the lexical paramater will use in fron end?

1929


which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?

2081


what is the prosses for getting of 33kv licence (i have completed my engineering degree & working in 33kv substation for contract basis )????

1992


what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering

2131


What is meant by cold loop test in instrument

2673


advantage and disadvantage of team work?

1750


We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.

2060