how is the wastage component in structural steel being
considered while doing the reconcillation for the
fabrication with returning of scrap under 1 meter length
Answer Posted / naresh
3% is the Wastage and 2.5% is consider out from this,0.5 goes to non consider that is cut and waste.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
whats is difference between anchorage length and development length
cement and sand required for one block of size 0.23*0.15*0.46
Form where IS456 is adopted in 1978?
What is Rankine Cycle?
What is bmc stands for in bmc software?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
undistributed samples are obtained by
What is the Maximum %age of Steel in columns and beams ?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
What are the strongest shapes in building?
When was the first motorway built in england?
Which Types Of Bricks ?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
How to get MEP technical,instaaltion & testing data for interview?