Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.

Answer Posted / aman kumar

Length of bulb=0.55 m
Dia. of bulb=2.5*0.3=0.75 m
Extra for bulb=0.75-0.3=0.45 m
Bulb volume= Area*Perimeter=1/2*0.55*0.225*3.14*0.3=0.058 cum for 1 bulb.
Pile volume=3.14/4*0.3*0.3*10=0.707 cum
So, For 1 bulb,Total quantity=0.707+0.058=0.765 cum
And For 2 bulb,Total quantity=0.707+2*0.058=0.823 cum

Is This Answer Correct ?    4 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Civil engineering material testing Standard results

1874


what is the specific gravity of rubble in plum concert

981


how lap length is increased with increase of Grade of steel?

25302


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1648


How many kilo-newtons equals 1000 kilogram?

668






how to create our resume?

1663


how to identify the failure of building by expansive soils

1234


How will you reduce the concrete flow after mixing the concrete

1729


2nd and 4rt angle elevation used in which country ?

1842


where i can get material costs on weekly basis

1669


will fix foundation bolts at site with out template is there any procedure?

2172


Please let me know what is the simplest way of Calculating Mix Designs

1521


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1499


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1385


What is the force exerted by the tacoma narrows bridge?

742