Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Defination of civil engineering

Answer Posted / jatin ghori

civil engineering is a professional engineering discipline that deals with the design,construction,maintanance of the physical and naturally built environment,including works like roads,bridges,canals,dams and buildings.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1951


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5382


How many lbs are there in a yard?

1156


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

4446


) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.

2697


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1431


how calculate the bearing from two coordinates?

2195


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

2394


Explain the difference between shear and tensile strength.

1047


Discuss some applications of modular elasticity?

1236


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

2204


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

2307


How to calculate Volume of Wet cement concrete for a specific grade?

2202


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2578


Define What is a projection line?

1103