The 4 main factors to start a construction project are––
How to estabilish reinforcement Steel rolling margin for a building projects ?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
Write short note on construction programme for pile foundation.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is concrete canvas?
Define relative co-ordinates?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Slump Values for works?
How to calculate canal slope curvature qty!
Gidc technical que paper
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Explain what is Critical Path Method (C.P.M)?