Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the Difference between E/P Positioner and I/P
positioner in a control valve? In which applications the
respective positioners are used in?

Answer Posted / kk verma

As we know all that IP converter works as current to pneumatic converter i.e 4-20 mA to 3-15 psi output, an EP converts the electrical signal to pneumatic for example SOV, solenoids valves are use for the operation of on off valve and use for fast response in action for valves, and the generally in sov electrical signal are use i.e 110 vdc this electrical signal is open the path of sov by actuating
and pneumatic goes to actuator part and valves operates.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

NPN transistor, SCR, Zener diode, LED, Varactor diode, Vortex meter, RTD, Resistor, Crystal

2235


what is the working principal of pribe

2342


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2214


IN CONTROL VALVE SPECIFICATIONS GENERALLY TERM " DE- 200" ."DM -400"USED,, WHAT IS DE/ DM STANDS FOR?

2280


What is intrinsic safety mean.

1954


where proximity sensor installed on tank in loading arm application

2313


What is the reason PT speed not incresed in gas turbine?

2449


can anyone guide me how to get any of the previous year GAIL question papers? are they available? 0n 2nd august i have to take the written test.

1958


How do you identify an orifice in the pipeline?

1302


what is SIL 1 2 3

2090


How many ohms are required for proper earthing?

1126


How to calculate P,I&D value in PID controller ?

2198


I faced several time siemens ps2 positioner automatically getting Chang in it's set point direction after auto calibration  So is there any causes biside this or  any  permissives ?

1898


For what reason would you possibly be compelled to make use of a Smith Predictor. Explain the idea behind the operation of this device.

1974


I am using 971 Enraf radar level transmitter for LPG tanks ,the tank side indicator gives the error code 999999999FL can any body give me any diagnostic for this issue?

2245