first you workout orginal quantity in mesurement, secondly workout in masonry. what is the diffrence between brick in measurement &brick in masonrybrick in masonry is less than brick in measurement.that means less the quantitry of cement mix. calculate howmuch percentage is the cement sand mix. less from the measuement quantity. then you will get how much quantities of bricks per m3. o.k
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What was asked in isro civil interview
Trapezoidal section footing calculation of Volume & its Area
What is the use of mirror command?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
how can we calculate steel value, depending on load
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
in 100 cft = 1350 bricks in 100 cft = ? bloks
five requirements of infill panels for walls?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
Which is the best book for building construction?
please briefly explain calculating or estimating steel quantity for a RCC column?
what is the type of earthing
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?