What is PQC. Means PQC
Answer Posted / him a bindu
PQC means pavement Quality Control concrete.... Used for Runway, Dispersal area in order to withstand heavy loading....basically a rigid pavement design with flexural strength minimum 40kg/Sq.cm .....
| Is This Answer Correct ? | 20 Yes | 7 No |
Post New Answer View All Answers
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Did any of the egyptian pyramids ever fall down?
How much does the leaning tower of pisa lean?
what is that one cub metre plaster in cemant and fine sand
what is the productivity in aluminium shuttering per day
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
Why Vitrified tile are getting pop up.
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
Which is the direction of negative angle?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????