What is the weight of 10mm,20mm,40mm aggregate per cubic
metre in kg?
Answer Posted / jayjit marik
1500 Kg
| Is This Answer Correct ? | 17 Yes | 2 No |
Post New Answer View All Answers
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the use of extend command?
What is demising walls?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
how gradation of aggregates effect on slump of fresh concrete?
What is critical path method (c.p.m)?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
why demand factor less then 1 ?
which formula used for calculate the area of segmental arch?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem