calculation of cement bags in 1:2:4 concrete mix
Answer Posted / munkeshwar kumar gupta
For 1 m3 of concrete (1:2:4)
Required volume of concrete = 1 m3
Estimated volume of dry material = 1 x 1.5 = 1.5 m3
Mix totals = 1+2+4 = 7 (1:2:4 cement:sand:gravel)
Ingredient Volumes: 1.5 x 1/7 = 0.2143 m3 cement
Bags of cement: 0.2143 m3 cement / 30 bag per m3(50 Kg bag)
= 6.429 bags of cement=7 bags of cement
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
What is the procedure of concealed plumbing in toilets?
How is make concrete cube?
How to find beam R/F cutting length
What is specific gravity???
Trapezoidal section footing calculation of Volume & its Area
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
What is the diff between cad & cadd?
how to calculate mivan shuttering matrial
How do You Maintain a structure after getting cube test of low strength.
how to find quantity of concrete in PCC M15
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11