Answer Posted / tiruupathi rao
SPRO→IMG→ENTERPRISE STRUCTURE →DEFINITION→LOGISTICS GENERAL →DEFINE, COPY, DELETE, CHECK, PLANT.
| Is This Answer Correct ? | 26 Yes | 1 No |
Post New Answer View All Answers
Where have we to specify the teardown time in one operation?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is 'capacity planning'?
Explain what is “work center” in sap pp and what is the use of data in work centers?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
Standard mrp steps
What are the types of master views for production and planning?
Mention what is the use of t-code cs20 in bom?
Explain how ‘pp’ is ‘integrated’ with other modules?
Integration between PP and MM Module.
What are the types of MIC?
What parameters you maintain in “plant parameters” in configuration?
What is purpose of schedule margin key?
Define standard cost
What are the reports generated in product cost controlling information system?