Answer Posted / harshraj
Normally refuge area provide at 8 th floor for 12 storied building.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is Curtailing of R/F
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
Why nautical mile is different from statute mile?
whats is difference between anchorage length and development length
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
1:4:8 pcc calculation 591 cu.ft
I want to join bhel because
what is flexible and rigid footing?
how is the reinforcement is distributed in triangular slab
Reinforcement details at hinged joint
How much quantity water should be placed in one cubic meter area?
how to conversation of all construction material in to brass
what is the water-cement ratio of mix design while 30mpa in 7 days?