If drainage is main things then which respect the super
Elevation may be provided?
Answer Posted / j ritesh naidu
superelevation is provided at curves to compensate the forces generated on moving object while it is turning ....otherwise the moving object has to slow down its speed in worst case the moving object may skid or even topple...super elevation on curves helps the moving object turn along the curve without reducing speed
drainage has no connection with superelevation ...for drainage part ,cross drainages along the road r provided
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What is the diameter of the 3"inch nails?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
what energized you to complete your course?
what radial pressure, the NP2 class rcc pipe can sustain?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
acceptance criteria for concrete works
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
List out some of the common problems that architect have to tackle it?
why are you joining in this (applied post) job and your aim for this job
What do you meant by gui?
Describe Briefly The Various Methods Of Concrete Curing?