Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

design mix for M15,M20, M25,M30 please

Answer Posted / teja

M-10 1:3:6
M-15 1:2:4
M-20 1:1.5:3
M-25 1:1:3

Generally concrete grade higher than M-20 is Design Mix.

Is This Answer Correct ?    2 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Cement consumption of one cubic meter of aerocon blocks masonry?

4095


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

2244


How to get MEP technical,instaaltion & testing data for interview?

2159


it is possiblee to produce concrete with out cracks...

1897


what is shuttering co efficient?

1893


How to decide/consider the grade of bitumen for dbm.

2233


Doul Bar reinforcement and details of drawing.

2491


if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????

2300


what is escalation?how it is done?

2503


What do you mean by bond? What are the different types of bonds?

2230


Define different types of roof systems?

1185


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3665


What are the ingredients of pre-stressed concrete?

1222


please briefly explain calculating or estimating steel quantity for a RCC column?

1962


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2853