Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much steel required for 1000 sq ft slab 4" thickness.

Answer Posted / ankit tasare

2000 kg steel required

2 kg steel required per sq ft slab

Is This Answer Correct ?    15 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why was the empire state building made of steel?

1149


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

2083


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2144


how to calculate reinforcment in staircase cranked beam?

2834


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1646


how much cement and sand consuptin in 4 inch siporex walls 100 sq ft

3005


quantity of material needed for rubble stone masonry for 1:4 and 1:6

1838


How did street originate in the plumbing term street ell?

1031


What is the Null Point of chimney in Power Plant

3753


Did any of the egyptian pyramids ever fall down?

1214


What is structural frames or systems?

1168


What is the general specifications of a bituminous pavement road?

1704


how i can tak Quantity of mortar in block work

2398


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

3001


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)