Answer Posted / rohit
505
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how much repeitation for conventional and maivan formwork?
sir how can we find the cement and sand required for making 4" drop
What are the steps involved in the concreting process?
how i convert mm into standard wire guage (SWG)no.
What is Heavy Concrete & Normal Concrete
What are segregation and bleeding?
How many are the types of joints?
how to caluclate sienerge qty in construction in ap
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What is the worlds largest concrete dam?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What is 1/8 on the architect ruler denotes?
trapozidal
what is the list of building construction equipment & teir output?