Answer Posted / manjunatha s
Involved and hard working and perfect.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
Why you are leaving present job?
how to shuttering is used in slab
How do you calculate the power of centrifugal pump?
What are the phases inspections are done by local authority while construction?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
Define polar co ordinates.
How to do bbs in excel format
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Why are steel plates inserted inside bearings in elastomeric bearing?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
60-70 grade of Bitumen is VG-30 ?