Answer Posted / rupesh kumar sahu
Quality of concrete can be checked by CTM AFTER 28 dYs curing.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how many tonnes equals to one cubic feet?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
very simple or less time consuming formula for reinforcement calculation by moment
how much cement sand n bricks required in im3?and how much in plaster?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
how many shuttering material required for 1000 sq.m built up area.
What goals do you have in your career?
What is 1/8 on the architect ruler denotes?
at what pressure ply-wood is obtained by gluing wooden sheets
Why we provide hair pin for shed
how much area can be platered by a mason for exterior
what is the mix design for M:60 with micro silica andmetakaoline?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.