Answer Posted / navdeep
it should be 2d;
2x12mm=24 mm cover
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what is mean by reestimation?
What is the difference between engineering stress and true stress?
What is the difference between linear dimension and aligned dimension?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
How to calculate Volume of Wet cement concrete for a specific grade?
RR masonry rate analysis
Types of column foundation and how to calculate its steel quantity.
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
What are the applications of the modulus of elasticity?
How can I make justification between using concrete grade c35 compare c37?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Define angular dimension?
What is Heavy Concrete & Normal Concrete