What is Workload? Can anyone explain in detail?
Answer Posted / akash
Workload is nothing but the whole scenario which includes.
1. No of scripts we are planning to run.
2. No of users per script.
3. LGs assigned to each script.
4. Test duration.
5. Ramp up and Ramp down settings.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How many users can I emulate with loadrunner on a pc?
What tools are required to analyze vuser run results?
What is a difference between pacing and think time?
What is the loadrunner start-transaction and its syntax?
Which are online monitors and windows resource monitors
How will you handle the situation in scripting where for your mailbox you have to select any one mail randomly to read?
How can we recording vuser scripts using vugen?
What are different types of vuser logs which can be used while scripting and execution?
Can anyone please mention what are the common errors that we can see while replaying the Vugen script and also while running the controller scneraio and How to handle them with a few examples. This will be greatly helpful.
What are monitors?
how to get current system time Loadrunner function?
What are the four selection methods when choosing data from a data file?
What should be done to view parameter substitution in the execution log?
What are the vuser components in loadrunner?
What is the difference between performance testing and performance engineering?