form work including the props can be removed from beams only after
Answer Posted / subhayan
depends on span for upto 6m 14 days and more than that 21days
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
How can i do RCC rate analysis?
which steel is better for residential building tmt steel or hysd steel
What is costing in 100squre feet bricks
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
why the openings of sieves are square io size?
How do you calculate reinforcement weight of steel?
what is flashing?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
what are the types of design? which type of method is used at what type of design & why?
what does the grad of cement shows (denotes)?
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
what would be the design load of R.C.C Cooling tower per cell.?
what is the difference b/w full length and cutting length?
Which is the best book for building construction?