One work center can assign 2 cost center and one cost can assign to different work center.
Answer Posted / sathish.v131990@gmail.com
one Wc can assign to One Cost centre .
One CC Can Assign to N no of WC
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
How do you get the system to update this value from the routing?
What are the production process in sap?
What are all the ‘technical types of bom’?
What is scope of planning?
What is planning file entry
What is the use of mrp group?
What is meant by payscale structure?
What is the use of plm (product lifecycle management) in sap pp?
Mention what are the t-codes for creating, changing and summarizing bom?
SPRO path for order, confirmation or requirement class.
You want to insert an inspection check point at the end of an operation. How would you do that?
Have you used Pull list or back flushing in REM?
What is purpose of schedule margin key?
Difference between plan cost, Actual cost and target cost.
What is requirement class and requirement type?