how to calculate cutting length in bar bending schedule for
180 degree bend? for 90 degree bend we take 2d i.e we -2d
for 180 degree ho much ? question asked at l&t

Answer Posted / tanmoy kar

It's totally a fake question bcos 180 degree bend means a straight bar . If a bar remains in straight position,then how is it possible to make a 180 degree bend.
This question was asked to verify the common sense of the candidate.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please let me know what is the simplest way of Calculating Mix Designs

1640


States some of the commonly used commands in cad software’s?

846


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

827


explain fie benefits of using standard terminology in the measurement process

1295


what is differences between ferrock and concrete ?

1526






difference between trapezoidal and pedestal footing and how the load acts on that

2434


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1709


what is escalation?how it is done?

2184


States some of the tool bars used in cad?

773


How to cal. The weight of hollow pipe?

830


Whats the meanig of ,'K' VALUE in the case of soil.....

1518


What is Critical path in Ms-Project ?

798


How did the romans get water up hills using aqua ducts?

910


In earth work 1300 cum soil how to calculate how many liters require in water

2101


What is the worlds largest concrete dam?

811