Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1.0 what is the permissible westage of steel in structural steel fabrication say gantry , trustle of power plant unit
2.0 what is the permissible westage of cement in construction work as above

Answer Posted / maria alphonse pandian

steel 1% and cement 3% is permissable.But this is variable as per site tender documents by individual companies.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2579


to minimize budget cost of building , what can i do

2175


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2676


Calculation of curtain wall of box culvert

6020


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2101


How long does it take concrete to harden?

1100


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3562


How many days should curing of plastering, brick work and concrete

1628


How to calculate 1 brss for RCC work  

2116


what is civil all interview questions

2684


What is semirigid connections?

2101


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1910


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

2118


Which ratio use for cement selery???

1865


What is an ortho mode?

1169