Answer Posted / madhu
2-dia
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Formula for calculation volume of essentric footing
what is parametre for M25 after 7 days strength
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
Howmuch bend to be provide for 200/600 BEEM
Explain what is zoning permit?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Is there the dry coefficient of cement is constant?
explain fie benefits of using standard terminology in the measurement process
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Explain different types of rcc pipes.
what is polity
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6