calculation of cement bags in 1:2:4 concrete mix
Answer Posted / kapil
1+2+4=7 total of 1:2:4 , then dry volume of concrete is 1.52
so 1 cubic meter is 1*1.52=1.52
then 1.52*1/7=0.217 cu meter cement
30 bag in 1 cu meter cement
than 30*0.217=6.51 bags ,
than sand is 2*1.52/7 = 0.434 cu meter
than metal is 4*1.52/7 = 0.868 cu meter
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define different types of roof systems?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
what is the 0 value in quantity surveying
Test procedure of fly ash bricks as per code ?
silt%= silt volume/ silt+sand volume is this right?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
How do you convert wind speed into force?
How do we determine the specific gravity of a cement?
what values & beliefs have guided you in your career path
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
How do you determine specific gravity of cement?
in 100 cft = 1350 bricks in 100 cft = ? bloks
door and window wood work calculations and different methods
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
What is a tensile strength? What is the tensile strength of wood?