I hv a question regarding power factor improvement just
after transformer. I request you to reply me plzz. thank
you sir.
My friend has a small unit of fabrication. in his factory
the main load is a welding machine, lathe machine, grinding
machine. this load is not continuous type. now our
electricity board has installed 16 KVA, 11000/433 V
transformer for our factory. In the energy meter (trivector
meter) at LV side of transformer, i hv seen power factor
value of 0.15 only when only 3 KW load was flowing. Further
electricity board has suggested to install 4 KVAR capacitor
at LV side after energy meter. Now my question is that if
we permanantly install and switch on 4 KVAR capacitor after
energy meter, during some load on transformer and also
without any load on transformer, wht will be the power
factor shown in energy meter?i dont want to get any penalty
by electricity board, so plz suggest me if i can
permanantly install and switch on the 4 kvar capacitor or
not at LV side of transformer just after energy meter?
Thank you again and awaiting for ur positive reply soon.
Answer Posted / m s venkateswara rao
It is not possible to maintain constant power factor at variable load. A little bit expensive but you have to go for procure auto pf panel, installed and connected immediately after EB meter.In APF panel controller you should set the pf range so that at different loads APF panel will automatically will switch on different rating of capacitors to maintain set pf.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?
Difference between earthing & grounding.?
how can get electrical c licence.now i am working in spining mill , transformer capacity 2750KVA. SANCTION DEMAND 2250KVA. PLEASE ADVISE ME . MY CONTACT NO 09944226823
what is the principle of the single phase energy meter? and,what is the advantages and disadvantages of single phase energy meter?
why and how voltage sharing in transformer, during magnetic balance test ?
How to calculate size of HT breaker with the help of Amp (current)? Please provide answers with examples.
in an electronic tri vector meter when the current and voltage sequence changes ? what is the effect of phase sequence on recording of meter
how to calculate distance between busbar supporters for LT panel, what are the factors influencing in this design
we are having 15kw and 3kw motor both can run in same time , instead of using copper we are using ug aluminium cable , 35 sq.mm is suitable for its current carrying capacity..?
What should be the length of transmission line so that we can see/obtain the full sine wave of voltage??
do we use neutral grounding for resistive balanced load? if we use what happen?
which pump used in STP
Why in metering Ct for ammeters ct secondary side is grounded for each Ct but not in case of CBCT (Core balance current transformer)..kindly some1 highlights the reason..is it because net flux is zero?
what is the vvvf in the dumbwaiter?? or lift. what is the actual process?/
1)What is a Triode? What are its uses? 2) What is a Triac? 3) What is a Thyristor?