Answer Posted / carl_ellis
Termination involves cutting and stripping the instrumentation wire, dressing the shield/screen with insulation on one end, installing crimp ferrules and connecting the wires to the screw or spring terminal terminal blocks.
Tradecraft includes maintaining the integrity of shield/drains at field instruments, junction boxes and marshalling panels.
Carl Ellis
Measure First
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is intrinscily safe system and where we use?
what is the PC interface and software for connection to ABB logic module “ LM011-CE18RAC “ ( for Programming ) ??
How can we test a bently nevda 3500/42M accelerometer monitor card by simulating it with test equipment?. what king od of signal (milli volts or volts or or resistance ) we should feed in the terminals of the card?
Calculate the maximum pressure drop that can be allowed to occur across a control valve, so that we can prevent cavitation / flashing from occurring. Use the following formula: Δ P allow = Km (P1 – PvapourA) where, Δ P allow - the maximum allowable differential pressure for sizing purposes, or terminal pressure drop; Km- the valve recovery coefficient from the manufacturer’s catalogue; P1 - absolute inlet fluid pressure; PvapourA - absolute fluid vapour pressure at the inlet temperature; Use Atmospheric pressure = 101.3 kPa, P1 = 1200 kPa(g), PvapourA = 4 kPa, KM = 0.72
How to Calibrate Temperature Switch in field
what different types of problems do occur while doing instrumentation commisioning and how to solve them? please explain in detail
State bernoulli’s application.
hi my name is rakesh patel i just complited my be in instrumentation & control now i am going to working as a validation engineer in a poject department so what is a scope in a future as a validation engginer ? what line is good for me can any bady give me complete solution please? your regard rakesh patel
What is standard of DCS panel design?and what is step of DCS panel design?wiring and type of connector(screw or DB connector)
field bus transmitter calibration procedure tell me
for oil & gas industries which zone is normally preferred? why? give its example?
What is instrumentation technologists and mechanics?
when placing a vent or drain hole on an orifice plate should you measure from the center of the bore up or down for the vent placement?
give eg of how I/P is used in control loops
Differentiate between ultrasonic flowmeter and radar type flow meter