i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula
Answer Posted / pradeep setty
your area should be 10'x10'in to thickness of concrete. Normally the thickness for open space is 4' to 5', but you have given the thickness has 25' also we need to select a standard concrete mix like M10,M15, M20...has per IS Code
So according to the dimension your requirement of concrete is 2.08m3 and i presume that M15(1:2:4) is sufficient for this work
Calculation
(1:2;4)= 7 cement by weight is 1440.00 kg/m3
1. cement required is 2.08/7 = 0.2971kg/m3* 1440.00 kg/m3 = 427.82 kg so (50 kg/bag) = 427.82/50 8.55 bags say 8.5 bags
2. Sand required is 0.2971*2 = 0.5942kg
3. Metal required is 0.2971*4 = 1.1884 Kg
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
Mention different types of roof systems?
how pumping of concrete effects the quantity of material used in it?
Design a rectangular channel.
.5Ast
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
Who name us Engineer & Why?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
What is a hatch patterns?
how water proof chemicals act in concrete to avoid leek?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
sir how can we find the cement and sand required for making 4" drop