comparision difference between GSB and WBM subbase in road
construction
Answer Posted / manjit singh
GSB -Granular Sub Base
WBM - Water Bound Meccadum
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
why do we not deduct volume of steel to find actual volume of concrete in practical???
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what is meant by residual strain?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
it is a corrected question." make a list of engineering property(properties) of soil.
What is the difference between engineering stress and true stress?
Please let me know what is the simplest way of Calculating Mix Designs
how to conversation of all construction material in to brass
How to calculate material and labor required for 100 m2 plaster?
What is the difference between Hinged and pinned in Column ends
Basic questions of civil engineering