proportions of m10, m15, m20, m25, m30, m40, m45, m50, m60,
m70, m75, m80 etc
Answer Posted / ramveer dhakad
M5 =1:5:10
M7.5=1:4:8
M10=1:3:6
M15=1:2:4
M20=1:1.5:3
M25=1:1:2
M
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
what is the weight of 12mm aggregates?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
Which prize is the alternative to the NOVEL Prize?
I need to constructive work in amaraj batteries
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
Can inverted beams used in pipes during construction?
what is right & short method of measurement of slab&beam
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
What are the basic use of runners and standards of pipelines?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
Coverage of 25mm.thick ratio of 1:4 cement mortar?
what is cement wastage percentage in NHAI ROAD WORKS