what is the consumption based planning ?
Answer Posted / sakthi dharan d
Based on historical consumption of data and uses forecasts and statistical method to find future requirements.
Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Can any body explain me why work scheduling view is required for semi finished and finished products?
You want to insert an inspection check point at the end of an operation. How would you do that?
What is the role of an administrator in pa?
what is std info set? where it is used?
Integration between PP and SD module.
In implementation stage tell some standard scenario before AS-Is & TO-BE
How you get the ticket?
What is the Difference between TECO and CLSD?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What is Schedule Margin key. How floats works in scheduling?
Which BOM item category you have used?
Explain schedule margin key
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
What is Individual and collective requirements and differecne between them in MTO scenario?