what is the consumption based planning ?
Answer Posted / sakthi dharan d
Based on historical consumption of data and uses forecasts and statistical method to find future requirements.
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
What are the production process in sap?
What is the use of t-code cs20 in bom?
What is the planning time fence?
what are the settings needed for variant configuration?
What is Auto GR?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
After doing realization how we will check whether it is working or not?
Explain the gaps and the steps involved in them.
What is the use of mrp pp evaluations?
How to delete a group of products that was created in screen mc84 ?
Integration between PP and PM module.
What happens to plan after it has been converted into production order?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
Explain Planning file entry.
How is indian slab and us slab?