what is the consumption based planning ?

Answer Posted / sakthi dharan d

Based on historical consumption of data and uses forecasts and statistical method to find future requirements.

Is This Answer Correct ?    14 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?

830


Can any body explain me why work scheduling view is required for semi finished and finished products?

764


You want to insert an inspection check point at the end of an operation. How would you do that?

806


What is the role of an administrator in pa?

730


what is std info set? where it is used?

2128






Integration between PP and SD module.

1169


In implementation stage tell some standard scenario before AS-Is & TO-BE

1531


How you get the ticket?

803


What is the Difference between TECO and CLSD?

5110


We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?

732


What is Schedule Margin key. How floats works in scheduling?

2718


Which BOM item category you have used?

1137


Explain schedule margin key

758


We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?

783


What is Individual and collective requirements and differecne between them in MTO scenario?

1754