what is mant by point of conter of fracher(p.c.f)
Answer Posted / chandan kumar singh
Where S.f changes sign B. M is max at that point and shear force is zero.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
to minimize budget cost of building , what can i do
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what are the values of compressieve strenght?
how to estimate material requirement for an area of house in square feet?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
what is the theoritical percentage of concrete cubes testing per day?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
What is absolute pressure? How absolute pressure is calculated?
why we are useing plastic under the lean concrete?and whts the advantage?
how to calculate valuation for the old building?