what is mant by point of conter of fracher(p.c.f)

Answer Posted / chandan kumar singh

Where S.f changes sign B. M is max at that point and shear force is zero.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

1995


to minimize budget cost of building , what can i do

1668


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2312


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2619


what are the values of compressieve strenght?

1601






how to estimate material requirement for an area of house in square feet?

1745


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1224


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

703


How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

1514


what is the theoritical percentage of concrete cubes testing per day?

4395


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2058


How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''

1649


What is absolute pressure? How absolute pressure is calculated?

680


why we are useing plastic under the lean concrete?and whts the advantage?

2163


how to calculate valuation for the old building?

1812