what is the problem not getting 7 days slab cycle in Mivan
formwork? what is the output of mivan carpenter per day?
Answer Posted / abhijit machale
Mivan shuttering output per day
Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
Tell me about triple point of water.
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
types of survey and levelling instrument ?
Define What glue is least sticky?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
In cement concrete how to check a quality of material also proportion of material at site ?
what is the criteria for the finalisation of pavement thickness in road project?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
What are the methods of measurement? Describe it shortly
how gradation of aggregates effect on slump of fresh concrete?
What is the difference between Hinged and pinned in Column ends
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.