How to take vector group test for Ynd11 transformer.
Answer Posted / umesh
Vector group is dittermind difination of transformer primery and secondry winding
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the IS standard for MCCB to be use (As per capacity of AMP)& for ACB also.
Tell me in detail about c.t. And p.t. ?
best manufacturer for busbar for outdoor switchyard having double bus bar scheme, can any one share technical specification of busbar. 132kv voltage ?
Explain the function and difference of Restricted earth fault, simple earth fault and sensitive earth fault with connection diagram.
What is the rating of a circuit breaker needed for 300 kv load in 33KV supply line of 33/415 transformer ? Whether 800/1200 amp vaccum circuit breaker can perform for a 33 KV line in input in 415 volt in output of the transformer ?
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
How halogen & merquery lamp works.
What is class ab operation?
how harmonics generated in induction furnance? how minimise it?
what is the difference between the voltage of 5 volts capacitor and and 5volts battery?
what is the effect of back reactive power on the generator ?
how to estimate wiring ins roughing ins. and boxes
Define the term Capacitance and Inductance?
If I have Energy Meter Ratio as 100:5 & Also I have CT Ratio as 50:5 then what will be my multiplying Factor(M.F.)
Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???